hydroelectric power plants
Figure left: hydroelectric power plant
Description:
Kaplan turbine with asynchronous generator 110kW
Client: Stadtwerke Metzingen
Figure right: controlling system for hydroelectric power plants
SAR Gröpler develops und produces complete hydroelectric power plants with Kaplan -, Francis -, flowing through or free-jet turbines.
Power spectrum from 15kW to 1800kW.
Clients e.g. Stadtwerke Tübingen u. Reutlingen.
Other installations in Koblenz, Augsburg, Garmisch Partenkirchen, Balderschwang, and abroad: France, Kenya, the Congo, Australia, Romania.
Your contact person: Peter Reusch
copyright © 2008 SAR Gröpler GmbH, Gutenbergstraße 43, D-72555 Metzingen | phone +49 (0) 7123 6000-8, fax +49 (0) 7123 6000-9 | email: info[at]groepler.com | privacy | webpages by so